FAQ

Frequently Asked Questions

Straight answers on MOQ, lead times, tolerances, materials, certifications, shipping and how quoting works.

Ordering & quotes

What is your minimum order quantity (MOQ)?

One piece. We regularly produce single prototypes and short runs alongside volume programs. Unit price improves with quantity, but there is no minimum to get started.

How does the quoting process work?

Send 2D drawings and/or 3D files (STEP, IGES, X_T, STL) plus quantity and finish requirements. An engineer reviews manufacturability and replies within 24 hours with price, lead time and DFM notes. Larger programs get a project review call before quotation.

Can you sign an NDA before I share drawings?

Yes — we sign customer NDAs routinely and operate under ISO/IEC 27001 information-security procedures. You can also send simplified models for the initial quote and full files after NDA signature.

What file formats do you accept?

Preferred: STEP (.stp/.step), IGES, Parasolid (.x_t), STL for printing. Drawings: PDF or DWG/DXF. If you only have 2D or a sketch, we can quote from that — and will confirm critical features in writing.

Lead times & capacity

How fast can I get parts?

Simple machined parts: 3–7 working days after drawing release. Complex 5-axis work: typically 7–15 working days. Quotes state the specific schedule for your part; expedite options are available on selected processes.

Can you handle production volumes, not just prototypes?

Yes. Production programs run across 127 machines, including lights-out cells on selected jobs. We scale from 1 pc to tens of thousands per year — often the same part, same process, same inspection plan as the prototype.

What is the largest part you can machine?

Up to 4,000 mm in a single piece on our large-frame machines. If your part is bigger or should be split for cost reasons, we will propose a joint or sub-assembly approach.

Tolerances, materials & finishes

What tolerances can you hold?

±0.01 mm is routine across the fleet; ±0.005 mm is typical on critical bores, fits and sealing faces; and we can achieve ±0.001 mm on suited geometry with the right material and process. We always confirm what is realistic at quoting — geometry, material and clamping all affect the answer.

Which materials do you machine?

Aluminum (6061, 7075, 2024), stainless (303, 304, 316, 17-4PH), carbon and alloy steels, titanium (Ti-6Al-4V), Inconel 718, brass, copper, plus engineering plastics — POM, PEEK, UHMW, PC, Nylon, PTFE.

Do you provide material certificates?

Yes — mill certificates and traceability from heat number to shipment are standard for critical programs, and available on request for any order.

What surface finishes are available?

As-machined Ra 0.4–1.6 μm, bead blasting, brushed, mirror polish; anodizing (Type II/III), zinc/nickel plating, passivation, powder coating to RAL, painting and laser marking. Finish specifications are confirmed against your drawing before production.

Quality & certifications

What certifications do you hold?

ISO 9001:2015 (quality), IATF 16949:2016 (automotive), ISO 13485:2016 (medical devices) and ISO/IEC 27001:2022 (information security). Certificate copies are available to customers on request.

Do you provide inspection reports?

First-article inspection reports (FAIR), full dimensional reports and certificates of conformance are available with shipment when specified on the order. Critical dimensions are measured on CMM and documented.

How do you handle quality issues?

With a formal corrective-action process: containment, root-cause analysis and preventive measures, communicated to you in writing. Any deviation from drawing is reported before shipment — never silently.

Shipping & payment

Do you ship internationally?

Yes — we ship worldwide by express (DHL/FedEx/UPS), air and sea freight via Shenzhen and Hong Kong. We handle export documentation and can ship on your freight account or ours.

What payment terms do you offer?

For prototypes and first orders: typically 50% deposit, balance before shipment (T/T). For established production accounts: net terms by agreement. All terms are confirmed in writing on the order confirmation.

Still have a question?

Write to us with the part or the problem — a real engineer will answer, usually within one business day.